Similar Articles

NEW FOR THURSDAY: Larger ‘Flagship’ Liquor Store Eyed For Route 50

BERLIN -- The liquor industry in Worcester County could change dramati...READ MORE

NEW FOR WEDNESDAY: Public Outcry, Crash Data Leads State To Reverse Earlier Traffic Light Decision

SNOW HILL -- One troubled intersection in the south end of Worcester C...READ MORE

NEW FOR WEDNESDAY: New Arts Center Now Open In Ocean City; Grand Opening Set For March 1

OCEAN CITY – The new Ocean City Center for the Arts is anxiously...READ MORE

NEW FOR MONDAY: 30th Annual Boat Show Growing To Meet Demand

OCEAN CITY -- The Seaside Boat Show, sponsored by the Ocean City-Berli...READ MORE

NEW FOR FRIDAY: Three Men Charged With Theft From Wal-Mart

BERLIN -- Three Salisbury residents were arrested on theft and theft s...READ MORE

Wicomico County Looks To Phase Out Inventory Tax

SALIBSURY – The Wicomico County Council is weighing whether to e...READ MORE

State Now Mulling New 113 Traffic Light

SNOW HILL -- Collective protests from the Snow Hill community and uniq...READ MORE

State Gun Debate Heats Up As Governor Testifies For Changes

ANNAPOLIS -- The first salvo in what has become a heated debate over t...READ MORE

Showell Students Score Wins At International Fest

BERLIN -- Though they couldn’t make the trip to Kentucky to part...READ MORE

Septic Repeal Bill Still Alive

BERLIN -- A local delegate’s effort to repeal the state’s ...READ MORE

Route 90 Project Nearly Complete

12/30/2011 | By News Editor, Shawn J. Soper

OCEAN CITY -- State Highway Administration (SHA) officials announced this week the final phase of the ongoing Route 90 guardrail replacement project, which has caused overnight lane closures for the last two months, is nearing the finish line and is expected to be completed next week.

The final phase includes removing and replacing all existing guardrails along the westbound side of Route 90 between Route 589 and Route 113.

The final stretch is expected to be completed over the course of three days next week, from Tuesday, Jan. 3 through Thursday, Jan. 5. The work will take place each night from 7 p.m. to 6 a.m.

During work hours in the final phase, all eastbound traffic along Route 90 heading into Ocean City will not be affected. However, westbound Route 90 will be closed to traffic during the nighttime work hours over the final three days of the project.

As a result, all westbound traffic along Coastal Highway hoping to utilize Route 90 will be detoured to Route 50 during the hours of the lane closures.

Signage will be posted along Coastal Highway, as well as Route 113, Route 589, Route 50 and St. Martin’s Neck Rd. advising motorists of the lane closures.

SHA crews and the contractor, L.S. Lee, Inc. of York, Pa., will continue to use variable message signs, arrow panels, traffic cones and barrels to advise motorists of the single-lane closures during the final stretch of the project.

SHA officials announced the two-phase project in October and the Route 90 spans have been subject to single-lane closures or complete closures for the last two months or so.

The first phase included replacing the guardrails on Route 90 between Route 113 and Route 589, while the second phase included the stretch between Route 589 and Coastal Highway. Each week from Sunday through Thursday between 7 p.m. and 6 a.m., the eastbound lanes of Route 90 were partially closed or completely closed, forcing motorists attempting to enter the resort to detour around Route 50 or consider a northern route through Delaware.

SHA District Engineer Donnie Drewer said in October the guardrail replacement project had been on the books for about 15 years and the time was right to undertake it. Drewer said an inspection of the guardrails on Route 90 could have expedited the project somewhat.

The guardrail replacement is the latest in a series of major undertakings along Route 90. Local residents will recall the bridge between Isle of Wight and Ocean City was closed for much of the winter beginning in October 2009 after a routine inspection revealed an 85-foot section of the span had deteriorated to the point it was unsafe for vehicles over 6,000 pounds to cross.

There are 1 comment(s).


LONG LONG overdue - and several lives lost because of the constant WAITING! You would think with only 2 ways in MD to access OC - priority would be to make these passage ways the safest in the state. Common sense knows that OC is the 2nd largest MD city in the summer and the MAJOR cash cow for MD gov't. I suspect if any of the City or Annapolis politico's fam members would've been hurt this update to Rt. 90 woulda happened YEARS ago. Focus now will go back to the constant discussion of the Rt 50 Bridge replacement initiative. Then in ohhhh 20 years they will finally replace it. Chaulk it up to short-term thinking!!!!!! BUSHMAN!
submitted by BUSHMAN on January 01, 2012 at 11:24 am

Leave a comment

Please complete all required fields.
Name*
Email
Comment*

Submit